ProjectsKey HIghlights
Sydney University -
Engineering PrecinctLaing O'Rourke
- 10 storey building demolition including robotic brokk demolition.
- Significant temporary works including full design scope, scaffolding, back propping, cutting & demolition engineering.
- Separation of structure from live building.
- Demolition rigging throughout.
- Excavation scope.
- Significant Hazmat including contaminated soil removal, ACM and lead.
- Tree removal and protection.